斯捷潘拉迪奇广场
Stjepan Radić Square
NFO架构:克里克文尼察中心监管公开竞赛于2011年宣布,项目第一阶段现已完成。2012年,海岸线向海延伸20m的工程完工后。一期项目,斯蒂耶潘·拉迪奇广场于2013年完工。随着主城广场的最终确定,克里克文尼察最终获得了第一个具有代表性的公共空间。下一阶段包括对市中心其他部分的监管,包括为祖国而牺牲的公园,以及城市展馆和另一个广场的建设。
NFO Architecture: The public competition for regulation of the center of Crikvenica was announced in 2011 and the first phase of the project is now completed. After the works on shore line expansion 20m towards the sea finished in 2012. First phase project, Stijepan Radić Square was completed in 2013. With finalisation of the main city square Crikvenica finally got the first representative public space. Next phases involve regulation of rest of the city center including the Park of the fallen for homeland and the construction of City pavilion along with another square.
© Ivan Dorotić
© Ivan Dorotić
© Ivan Dorotić
© Ivan Dorotić
© Ivan Dorotić
© Ivan Dorotić
© Ivan Dorotić
© Ivan Dorotić
© Ivan Dorotić
© Ivan Dorotić
© Ivan Dorotić
© Ivan Dorotić
© Ivan Dorotić
© Ivan Dorotić
© Ivan Dorotić
© Ivan Dorotić
© NFO
© NFO
广场的概念源于长廊及其主要元素——树线,克里克文尼察市的主要传统之一,过去停在斯捷潘·拉迪奇广场。我们的目标是修补这条裂缝,并因此将克里克文尼察东南部重新整合为城市的一部分。这样克里克文尼察就成了海滨长廊的一个中心点,长廊位于滨海小镇特拉梅尔吉和塞尔西之间,以及海岸线沿线的公共设施。
Concept of the square derives from The promenade and its main element, the tree line, one of the main traditions of city Crikvenica, that used to stop at the Stjepan Radić Square. The goal was to patch that crack and, as a result, to reintegrate south-east part of Crikvenica as a cohesive part of the city. That way Crikvenica becomes a central point of the long stretch of seaside promenades between small costal towns Dramalj and Selce and its public contents along the shoreline.
The tree line as a main element of the promenade forms a backbone which collects different public contents creating various ambients along the promenade. Stjepan Radić Square becomes a center towards which all the seaside movement gravitates and, as such, demands a large open space.
长廊被拉进公共设施(露台)内,沿着树木线形成主广场,克里克文尼察唯一清晰的海景。避免了强力干预,以便在主广场上实现各种使用可能性。现有地面高差用于区分梯田与广场开放空间,在广场与梯田的接触区形成楼梯/休息区。用于餐饮内容的阴影露台成为面向大海和广场的观众空间。在树梢之间设置了悬挂物,以防日晒雨淋,同时不破坏广场的主要(干净)环境。道路是一个负面因素,其温和且频繁的去杠杆化“石浪”“与此相反,广场成为吸引汽车和行人的地方,使所有交通参与者都能舒适而缓慢地移动。道路与行人区断开,采用镶嵌式触觉障碍物,以确保安全,并告知道路信息,而不会造成面向大海的视觉障碍。
The promenade is pulled inside with its public contents (terraces) and along with the tree line it forms the main square with the only clear sea view in Crikvenica. Strong interventions were avoided so that the various usage possibilities on the main square would be possible. The existing ground height difference is used to differentiate terraces from the open space of the square forming a staircase / sitting area on the contact zone of the square and terraces. Shaded terraces for catering contents became an audience space towards the sea and the square. Over-hangs were put among the tree tops for the protection from the sun and rain without damaging the main (clear) ambient of the square. The road as a negative factor with its mild and frequent denivelations „stone waves“ in contrast with the square becomes an attraction for the cars and for the pedestrians, enabling comfortable and slow movement of all participants in traffic. The road is disconnected from the pedestrian zone with tactile barriers in tessellation for safety and to inform about the road without creating a visual barrier towards the sea.
Landscape Architecture: NFO Architecture
Design team: Kata Marunica, Nenad Ravnić, Dijana Pavić, Tatjana Liktar, Tamara Marić
Design: 2011
Realized: 2013
Location: Crikvenica, Croatia
Area: 11.974 m2
Client: Municipality of Crikvenica (public competiton 2011)