Phase 1 Renovations at Eastern Market Metro Park

景观设计 / 公共空间 2020-9-27 18:06

Phase 1 Renovations at Eastern Market Metro Park

Architect: Moya Design Partners
Location: Southeast Washington, DC, USA | View Map
Project Year: 2020
Category: Parks/Gardens

Phase 1 Renovations at Eastern Market Metro Park

Phase 1 Renovations at Eastern Market Metro Park

Phase 1 Renovations at Eastern Market Metro Park

Phase 1 Renovations at Eastern Market Metro Park

Phase 1 Renovations at Eastern Market Metro Park

Phase 1 Renovations at Eastern Market Metro Park

华盛顿特区,2020年7月8日—Moya Design Partners非常高兴地宣布位于华盛顿特区东南部的新东部市场地铁公园一期工程完工。
Washington, DC July 8, 2020 – Moya Design Partners is excited to announce the completion of the new Eastern Market Metro Park – Phase 1, for the Department of General Services (DGS) in Southeast Washington, DC.

Moya Design Partners是本项目的记录建筑师,他与华盛顿特区总务部、Keystone Plus Construction和国会山社区一起庆祝全新的、翻修的东部市场地铁公园(EMMP)第一期的开业。东部市场是华盛顿为数不多的历史悠久的公共市场建筑之一。周围的社区,也包括军营街,由六块不同的土地组成,拥有复杂的所有权和管理权。2013-2014年,Barracks Row Main Street委托实施了一项社区主导的总体规划,要求改善东部市场地铁站周围的公共空间。
Moya Design Partners, the Architect of Record on this project, joins the DC Department of General Services, Keystone Plus Construction, and the Capitol Hill community in celebrating the opening of Phase 1 of the all-new, renovated Eastern Market Metro Park (EMMP). Eastern Market is one of the few historic public market buildings left in Washington, DC. The surrounding neighborhood, which also houses Barracks Row Main Street, is composed of six disparate parcels of land under complex ownership and management. In 2013-14, Barracks Row Main Street commissioned a community-led master plan that called for public space improvements surrounding the Eastern Market Metro station.

From 2018–2020, Moya Design Partners led a team of landscape architects and engineers including LandDesign, AMT, Simpson, Gumpertz & Heger, and SETTY,

与华盛顿特区总务部(DGS)和华盛顿特区公园和娱乐部(DPR)合作,让社区参与开发、完善和实施历史悠久的国会山安全繁荣的“城镇广场”设计。
that worked with the DC Department of General Services (DGS) and the DC Department of Parks and Recreation (DPR) to engage the community in developing, refining, and implementing the design for a safe and thriving “Town Square” for historic Capitol Hill.

Keystone Plus Construction管理本设计-建造项目的施工。其他特区和联邦机构也为项目的顺利完成做出了贡献,包括地区交通部、能源和环境部、规划办公室、华盛顿水资源部、美术委员会、华盛顿州历史保护办公室、国家首都规划委员会和国家公园管理局。
Keystone Plus Construction managed the construction of this design-build project. Other DC and Federal agencies contributed to the successful completion of the project, including District Department of Transportation, Department of Energy and the Environment, the Office of Planning, DC Water, Commission on Fine Arts, the DC Historic Preservation Office, National Capital Planning Commission, and the National Park Service.

Moya Design Partners的项目经理Marilaura Guerrero说:“我很高兴东部市场地铁公园对公众开放,因为这是一个我非常珍视的项目。”。“这个过程不仅重申了给社区一个强有力的声音是多么的强大和重要,而且这个项目还涉及到与华盛顿的每一个机构的协调。与如此出色的团队一起工作是一种非常有益和美妙的经历。”
“I’m excited that Eastern Market Metro Park is open to the public, because it’s a project that I hold very dear to my heart,” said Moya Design Partners’ Project Manager Marilaura Guerrero. “Not only did the process reiterate how powerful and important it is to give a strong voice to the community, this project also involved coordination with every single agency in DC. It has been a rewarding and wonderful experience to work with such an amazing team.”

东部市场地铁公园的主要目标是将该地区及其周围的DPR/NPS/WMATA公园改造成一个社区聚集空间,支持多代人的社会活动。该地区的一些其他目标包括改善连通性、增强多式联运通道和增加绿色基础设施。这是第一个使用可持续基础设施研究所的ENVISION计划的地区项目。ENVISION有助于使新的基础设施与DC在全市范围内的恢复能力目标保持一致。
The primary goal for Eastern Market Metro Park was to transform the area and surrounding DPR/NPS/WMATA parkland into a community gathering space that supports multi-generational social activities. Some of the District’s other objectives included improved connectivity, enhanced multi-modal transit access, and increased green infrastructure. This is the first District project to use the ENVISION program from the Institute for Sustainable Infrastructure. ENVISION helps to align new infrastructure with DC’s citywide resiliency goals.


Moya design Partners的首席执行官Paola Moya说:“我的公司很荣幸与总务部合作设计东部市场地铁公园。”。“多年来为DGS设计了多个公共空间,现在有幸在这个高度过渡的公园里为这个社区创造空间。”

“It has been an honor for my firm to collaborate on the design for the Eastern Market Metro Park for the Department of General Services,” said Paola Moya, CEO of Moya Design Partners. “Having worked on several public spaces for DGS over the years, it’s a privilege to now help create the space for this community in this highly transited park.”


Moya Design Partners和LandDesign,Inc.在AMT LLC(AMT)(土木工程师)、Simpson、Gumpertz&Heger(SGH)(结构)、SETTY(MEP)和应用考古与历史协会(AAHA)的支持下完成了设计。该设计采用了最先进的游乐场,配有防溅垫和遮阳结构。带有斑驳阴影的bosque有休闲座椅,而地铁的表演空间有助于社区参与。该设计的其他特点包括雨水花园、改进的雨水管理以及宾夕法尼亚大道沿线的景观改善。


Moya Design Partners and LandDesign, Inc. developed the finished design with support from AMT LLC (AMT) (civil engineers); Simpson, Gumpertz & Heger (SGH) (structural); SETTY (MEP); and Applied Archaeology & History Associates (AAHA). The design features a state-of-the-art playground with a splash pad and shade structures. A bosque with dappled shade has seating for leisure, while a performance space at the Metro contributes to community engagement. Other features of the design include rain gardens, improved stormwater management, and landscape improvements along Pennsylvania Avenue.

为了加强公园和东南图书馆之间的关系,莫亚建议在第7街设置一个桌面条件,与景观美化相结合,以衬托图书馆标志性的美术立面。图书馆正在计划自己的翻修,因此设计为DCPL编程留出了空间,以激活、美化和提供室外噪音缓解。关于作为交通枢纽的公园,该团队改进了交通和行人流通,包括ADA无障碍通道。
To enhance the relationship between the park and the Southeast Library, MOYA proposed a tabletop condition on 7th Street that pairs with landscaping to set off the library’s iconic Beaux Arts façade. The library is planning its own renovations, so the design makes space for DCPL programming to activate, beautify, and provide noise mitigation outdoors. With respect to the park as a transit hub, the team made traffic and pedestrian circulation improvements including ADA accessible paths.


协同设计
MOYA在东方市场地铁公园的设计挑战是领导一个协作过程,不仅涉及国会山社区,还涉及多个审查机构。我们与国家公园管理局(NPS)、美术委员会(CFA)、历史保护审查委员会(HPRB)、地区交通部(DDOT)、地区公园和娱乐部(DPR)、规划办公室(OP)、国家资本规划委员会(NCPC)、能源与环境部(DOEE)合作,华盛顿大都会区交通管理局(WMATA)和总务部(DGS)将在一个所有权和管辖权复杂的项目中获得监管部门的批准。

A Collaborative Design
MOYA’s design challenge at Eastern Market Metro Park was to lead a collaborative process that involved not only the Capitol Hill community, but also multiple review agencies. We worked with the National Park Service (NPS), Commission of Fine Arts (CFA), Historical Preservation Review Board (HPRB), District Department of Transportation (DDOT), District Department of Parks and Recreation (DPR), Office of Planning (OP), National Capital Planning Commission (NCPC), Department of Energy & Environment (DOEE), Washington Metropolitan Area Transit Authority (WMATA), and Department of General Services (DGS) to achieve regulatory approval in what was a complex project for ownership and jurisdiction.


设计过程于2018年秋季开始,一期工程于今年2月开始。在整个地区内,由Pat领导的区域市场顾问团队和MOYA团队进行整合。

The design process began in the fall of 2018, and Phase 1 construction began this February. Throughout the process, MOYA led meetings between the design-build team; federal, District, and local agencies; the Eastern Market Metro Park Advisory Team (EMMPAT); and ANC 6b to truly integrate the community’s voice.


建设阶段:
东部市场地铁公园的建设分为两个阶段,以便公众在夏季享受空间。第一阶段涉及1号地块,包括一个游乐场,配备有供2-5岁和5-12岁儿童使用的设备、防溅垫、休闲草坪、甲板自然区、改良生物滞留设施和一棵新的常绿树。二期工程(计划于2020年秋季开始)包括2号、3号、4号、5号、6号地块和周边街道,包括1号地块区域的周边。公园改善包括但不限于以下内容:

Construction Phases:
Construction of Eastern Market Metro Park is split into two phases to allow the public to enjoy the space during the summer. Phase 1, which involves Parcel 1, includes a playground with equipment for children from ages 2-5 and 5-12, the splash pad, a recreation lawn, a deck nature area, improved bioretention, and a new evergreen tree. The work being performed for Phase 2 (scheduled to start in Fall 2020) includes Parcels 2, 3, 4, 5, 6 and the surrounding streets that also include the perimeter of Parcel 1 area. The park improvements include but are not limited to the following:

1一个波状区域;
2。在东南部D街(北和南部)关闭转弯车道;
3。路缘灯熄灭;
4。外部“亭子”遮阳结构;
5。长椅;桌子;饮水机;
6。自行车架;
7。轻型系船柱;
8。引导引导;
9。<10 ADA路缘升级。东南第七街的高架人行道(桌面);
11。景观美化;
12。路面标线和座墙。
1. A bosque area;
2. Slip lane access closure(s) at both D Street, SE (north and south);
3. Curb calming bulb-outs;
4. Exterior “Pavilion” shade structure;
5. Seating benches; tables; drinking fountain;
6. Bike racks;
7. Light bollards;
8. Signage-wayfinding;
9. ADA curb ramp upgrades;
10. Raised sidewalk (tabletop) at 7th Street, SE;
11. Landscaping;
12. Pavement markings and seating walls.

Phase 1 Renovations at Eastern Market Metro Park